22/32
I fully plumbed the air and electrics which compared to a modern air suspension trailer are quite basic and I added the mechanical ratchet hand brake and a cable which runs to the front axle brake levers. It only remained for a floor to be cut to size from thin Balsa, I had added side raves from channel with only a few side members to support the floor, you could add every member but once the floor is on these won’t be seen so it was a case of saving materials and time. The rope hooks made from bent wire were super glued to the channel side raves with two at the front and rear, a total of 52 but the thick type of superglue is superb for this and it didn’t take too long.
- Posted on
- Tuesday 15 September 2015
- Albums
- Visits
- 466
- Rating score
- no rate
- Rate this photo
0 comments